Friday 26th of April 2024
 

Intelligent Module for Selection of New Part to be Released in to the System for Online Scheduling of Flexible Manufacturing System



The first stage in the development of any intelligent control system is to analyze the problem thoroughly and identify the important system parameters involved. In this work, the problem is described by four parameters, 1)Due date, 2) Job value, 3)Batch size and 4).Processing time. The Intelligent module is developed by using NeuroSolutions based on the hierarchical approach for “the selection of new part to be released in to the system for online scheduling of FMS”. The system was defined with system parameters and their known range of values. For a typical set of inputs of a test problem, the correctness of the module is verified by empirical approach.

Keywords: FMS, scheduling, Due Date, Batch size, Processing time

Download Full-Text

IJCSI Published Papers Indexed By:

 

 

 

 
+++
About IJCSI

IJCSI is a refereed open access international journal for scientific papers dealing in all areas of computer science research...

Learn more »
Join Us
FAQs

Read the most frequently asked questions about IJCSI.

Frequently Asked Questions (FAQs) »
Get in touch

Phone: +230 911 5482
Email: info@ijcsi.org

More contact details »