Thursday 25th of April 2024
 

Standard Swarm Optimization to Solve Machine Scheduling Problem with Fuzzy Starting Time


Y. M. Assem, A. A. El-Sawy and Y. A. Nada

One of machine scheduling problems called machine time scheduling. The starting time in this problem will be assumed fuzzy with trapezoid membership function. A standard particle swarm optimization algorithm with constriction factor has been developed to find the best shape of membership function to find best starting time for each machine in each cycle by mean max defuzzification method.

Keywords: Machine Time Scheduling, Particle Swarm optimization, Fuzzy, Time Window, Trapezoid membership function, mean max defuzzification method

Download Full-Text


ABOUT THE AUTHORS

Y. M. Assem
Computer Engineering Dept., Faculty of Computers and Information Technology, Taif University Taif, KSA

A. A. El-Sawy
Computer Science Dept., Faculty of Computers and Information, Benha University Egypt

Y. A. Nada
Computer Engineering Dept., Faculty of Computers and Information Technology, Taif University Taif, KSA


IJCSI Published Papers Indexed By:

 

 

 

 
+++
About IJCSI

IJCSI is a refereed open access international journal for scientific papers dealing in all areas of computer science research...

Learn more »
Join Us
FAQs

Read the most frequently asked questions about IJCSI.

Frequently Asked Questions (FAQs) »
Get in touch

Phone: +230 911 5482
Email: info@ijcsi.org

More contact details »