Friday 29th of March 2024
 

Research on Reliability and Cost Integrated Optimization Algorithm of Construction Project Logistics System


Xiaoping Bai and Xiaomin Gu

The structure of the construction project logistics system is decomposed in detail; some uncertain factors affecting system reliability are analyzed. This paper applies the probability-influence coordinate graph to screen out the logistics subsystem that has great influence on system reliability under the conditions of occurring failure, and establishes an allocation model of the reliability index in construction project logistics system based on the restriction of cost, makes use of the presented model and algorithm to calculate the cost-based reliability, contrasts it with the index reliability assigned by the scoring method to the optimal distribution value of reliability index and the optimal cost. The presented detailed methods and steps can offer the meaningful reference for reliability optimization management of the logistics system in the construction project.

Keywords: Reliability, Optimization, Algorithm, Costs, Logistics, Construction, Project management

Download Full-Text


ABOUT THE AUTHORS

Xiaoping Bai
Xi’an,710055, China

Xiaomin Gu
Xi’an,710055, China


IJCSI Published Papers Indexed By:

 

 

 

 
+++
About IJCSI

IJCSI is a refereed open access international journal for scientific papers dealing in all areas of computer science research...

Learn more »
Join Us
FAQs

Read the most frequently asked questions about IJCSI.

Frequently Asked Questions (FAQs) »
Get in touch

Phone: +230 911 5482
Email: info@ijcsi.org

More contact details »