Wednesday 24th of April 2024
 

A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt



Estimating of the overhead costs of building construction projects is an important task in the management of these projects. The quality of construction management depends heavily on their accurate cost estimation. Construction costs prediction is a very difficult and sophisticated task especially when using manual calculation methods. This paper uses Artificial Neural Network (ANN) approach to develop a parametric cost-estimating model for site overhead cost in Egypt. Fifty-two actual real-life cases of building projects constructed in Egypt during the seven year period 2002-2009 were used as training materials. The neural network architecture is presented for the estimation of the site overhead costs as a percentage from the total project price.

Keywords: Construction Projects, Project Site Overhead Cost, Egypt, Artificial Neural Network

Download Full-Text

IJCSI Published Papers Indexed By:

 

 

 

 
+++
About IJCSI

IJCSI is a refereed open access international journal for scientific papers dealing in all areas of computer science research...

Learn more »
Join Us
FAQs

Read the most frequently asked questions about IJCSI.

Frequently Asked Questions (FAQs) »
Get in touch

Phone: +230 911 5482
Email: info@ijcsi.org

More contact details »